Project Estro
Karen Brady
Tsien White
Samuel Sutanto
Foldable heels for your daily business
Problem Statement
• There’s a need for comfortable footwear
• High-end shoe is limited to one type
either high heels or flat shoe
• Easy switch from formal to casual
without to carry extra shoes
• Focus mainly on business women
What’s available right now?
What’s available right now?
What’s available right now?
Mission and Goals
• Market leader in high-tech shoe design
• Increase flexibility and shoe choice
for women
• Maintain quality
and style
Assumptions
• Utilize current manufacturer for body
and sole of the shoes
• Seeking new manufacturer for heels
• Shoe will be packaged at the existing
packaging supplier
• Distribution channel will be the same as
current shoes
Scope Statement
• Market Analysis
• Patent Plan
• Budget Analysis
• R&D Product Specification
• Supplier Chain Plan
Work Breakdown Structure
Estro
1.0
Market
Research
Analysis
1.1
Competition
Analysis
1.1.1.1
Niche Market
Studies
1.1.1.2
Patent Plan
1.1.2
Budget
Analysis
1.2
Preliminary
Cost Benefit
Analysis
1.2.1
Identify Profit
Margin
1.2.1.1
Sales
Projection
1.2.2
R&D Product
Specification
1.3
Design
Concepts
1.3.1
Supply
Chain
1.4
Find Shoe & Heel
manufacturer
1.4.1
Market Survey
1.1.1.3
Engineering
of Heels
Design
1.3.2
Shoes
Design
1.3.3
Online market
studies
1.1.1.4
Point of purchase
studies
1.1.1.5
Patent
Investigation
1.1.2.1
Identify Risk
1.2.1.2
Identify ROI
1.2.1.3
Identify R&D
Cost
1.2.1.4
Identify
Production
Cost
1.2.1.5
Material
Research
1.3.3.1
Material
Research
1.3.2.1
Packaging
1.4.6
Quality Assurance
1.4.5
Shipping
1.4.7
Identify
Hidden Cost
1.2.1.6
Material Sourcing:
Heel
1.4.2
Material Sourcing:
Upper
1.4.3
Material Sourcing:
Sole
1.4.4
Prototype I
1.3.4
Prototype II
1.3.5
Prototype III
1.3.6
Finalize
Material
1.3.7
Market
Studies
1.1.1
Success Criteria
• Provide interchangeable shoe for women
• Engineering and R&D design to fit per
market demand
• Using our established market to
introduce the shoes
Network Diagram
18
27
Market Studies
1.1.1
(10 days / 0 float)
18
27
1
4
Competition Analysis
1.1.1.1
(4 days / 5 float)
6
9
1
8
Niche Market Studies
1.1.1.2
(8 days / 1 float)
2
9
3
6
Patent Plan
1.1.2
(4 days / 33 float)
36
39
10
17
Market Survey
1.1.1.3
(8 days / 0 float)
10
17
1
9
Online market
studies
1.1.1.4
(9 days / 0 float)
1
9
1
2
Point of purchase
studies
1.1.1.5
(1 day / 7 float)
9
9
1
2
Patent Investigation
1.1.2.1
(2 days / 33 float)
34
35
40
40
Identify Profit
Margin
1.2.1.1
(1 day / 0 float)
40
40
40
43
Design Concepts
1.3.1
(4 days / 0 float)
40
43
52
61
Engineering of
Heels Design
1.3.2
(10 days / 0 float)
52
61
44
51
Shoes Design
1.3.3
(8 days / 0 float)
44
53
62
63
Material
Research
1.3.2.1
(2 days / 0 float)
62
63
52
54
Material
Research
1.3.3.1
(3 days / 9 float)
61
63
68
69
Finalize Material
1.3.7
(2 days / 0 float)
68
69
70
73
Prototype II
1.3.5
(4 days / 0
float)
70
73
74
81
Prototype III
1.3.6
(8 days / 0
float)
74
81
70
77
Find Shoe & Heel
manufacturer
1.4.1
(8 days / 4 float)
74
81
87
90
Packaging
1.4.6
(4 days / 0 float)
87
90
82
86
Quality
Assurance
1.4.5
(5 days / 0 float)
82
86
91
94
Shipping
1.4.7
(4 days / 0 float)
91
94
70
73
Material Sourcing:
Heel
1.4.2
(4 days / 8 float)
78
8170
71
Material Sourcing:
Upper
1.4.3
(2 days / 10 float)
80
81
70
71
Material Sourcing:
Sole
1.4.4
(2 days / 10 float)
80
81
64
67
Prototype I
1.3.4
(4 days / 0
float)
64
67
28
31
Identify Risk
1.2.1.2
(4 days / 0 float)
28
31
28
28
Identify ROI
1.2.1.3
(1 day / 3 float)
31
31
28
29
Identify R&D Cost
1.2.1.4
(2 days / 2 float)
30
31
28
30
Identify Production
Cost
1.2.1.5
(3 days / 1 float)
29
31
28
28
Identify Hidden Cost
1.2.1.6
(1 day / 3 float)
31
31
32
39
Preliminary Cost
Benefit Analysis
1.2.1
(8 days / 0 float)
32
39
28
30
Sales Projection
1.2.2
(3 days / 9 float)
37
39
Schedule/Gantt Chart
Schedule/Gantt Chart
Budget
Risk Log
Quality Assurance
Patent Investigation
Thank You
Karen Brady
Tsien White
Samuel Sutanto

More Related Content

Viewers also liked (7)

Mi presentation presentation
Mi presentation presentationMi presentation presentation
Mi presentation presentation
 
03_29_2015_Phase 3_Compiled Document_v3.3_DH
03_29_2015_Phase 3_Compiled Document_v3.3_DH03_29_2015_Phase 3_Compiled Document_v3.3_DH
03_29_2015_Phase 3_Compiled Document_v3.3_DH
 
Surveying local innovation. Coventry and beyond
Surveying local innovation. Coventry and beyondSurveying local innovation. Coventry and beyond
Surveying local innovation. Coventry and beyond
 
Project Management: New Product Development for Amazon Ceramic Industries
Project Management: New Product Development for Amazon Ceramic IndustriesProject Management: New Product Development for Amazon Ceramic Industries
Project Management: New Product Development for Amazon Ceramic Industries
 
Project Management
Project ManagementProject Management
Project Management
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Restaurant project
Restaurant projectRestaurant project
Restaurant project
 

Similar to Project Estro_LinkedIn

final no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptxfinal no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptx
ssusera46859
 

Similar to Project Estro_LinkedIn (20)

Lockandlock
Lockandlock Lockandlock
Lockandlock
 
Product Design Handout week 3
Product Design Handout week 3Product Design Handout week 3
Product Design Handout week 3
 
Dr Robert Phaal - Technology roadmapping: a case study
Dr Robert Phaal - Technology roadmapping: a case studyDr Robert Phaal - Technology roadmapping: a case study
Dr Robert Phaal - Technology roadmapping: a case study
 
Shoe Deodorizer Manufacturing Plant Project Report.pptx
Shoe Deodorizer Manufacturing Plant Project Report.pptxShoe Deodorizer Manufacturing Plant Project Report.pptx
Shoe Deodorizer Manufacturing Plant Project Report.pptx
 
Design & planning (v. 2017-2018 eng)
Design & planning (v. 2017-2018 eng)Design & planning (v. 2017-2018 eng)
Design & planning (v. 2017-2018 eng)
 
Toyo Tire and Rubber - Applying QFD and TRIZ (2017)
Toyo Tire and Rubber  - Applying QFD and TRIZ (2017)Toyo Tire and Rubber  - Applying QFD and TRIZ (2017)
Toyo Tire and Rubber - Applying QFD and TRIZ (2017)
 
Nut Bolt Manufacturing Project Report 2023 Edition
Nut Bolt Manufacturing Project Report 2023 EditionNut Bolt Manufacturing Project Report 2023 Edition
Nut Bolt Manufacturing Project Report 2023 Edition
 
Term paper on crocs
Term paper on crocsTerm paper on crocs
Term paper on crocs
 
Standards, Codes, and Specifications: NDT
Standards, Codes, and Specifications: NDTStandards, Codes, and Specifications: NDT
Standards, Codes, and Specifications: NDT
 
Project Report on Outdoor Cushion Fabric Manufacturing Plant
Project Report on Outdoor Cushion Fabric Manufacturing PlantProject Report on Outdoor Cushion Fabric Manufacturing Plant
Project Report on Outdoor Cushion Fabric Manufacturing Plant
 
Project Report on Silica Sand Processing Plant
Project Report on Silica Sand Processing PlantProject Report on Silica Sand Processing Plant
Project Report on Silica Sand Processing Plant
 
Project Report on Frozen Finger Chips Manufacturing Plant
Project Report on Frozen Finger Chips Manufacturing PlantProject Report on Frozen Finger Chips Manufacturing Plant
Project Report on Frozen Finger Chips Manufacturing Plant
 
Guidelines
GuidelinesGuidelines
Guidelines
 
Pavers Block Manufacturing Plant Detailed Setup and Cost Report.pptx
Pavers Block Manufacturing Plant Detailed Setup and Cost Report.pptxPavers Block Manufacturing Plant Detailed Setup and Cost Report.pptx
Pavers Block Manufacturing Plant Detailed Setup and Cost Report.pptx
 
Product design development week 1 notes
Product design development week 1 notesProduct design development week 1 notes
Product design development week 1 notes
 
The tester's dilemmas
The tester's dilemmasThe tester's dilemmas
The tester's dilemmas
 
Miniplate and screw implant
Miniplate and screw implantMiniplate and screw implant
Miniplate and screw implant
 
final no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptxfinal no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptx
 
Tcm Workshop 1 Technology analysis
Tcm Workshop 1 Technology analysisTcm Workshop 1 Technology analysis
Tcm Workshop 1 Technology analysis
 
1 Introduction.ppt
1 Introduction.ppt1 Introduction.ppt
1 Introduction.ppt
 

Project Estro_LinkedIn

  • 1. Project Estro Karen Brady Tsien White Samuel Sutanto Foldable heels for your daily business
  • 2. Problem Statement • There’s a need for comfortable footwear • High-end shoe is limited to one type either high heels or flat shoe • Easy switch from formal to casual without to carry extra shoes • Focus mainly on business women
  • 6. Mission and Goals • Market leader in high-tech shoe design • Increase flexibility and shoe choice for women • Maintain quality and style
  • 7. Assumptions • Utilize current manufacturer for body and sole of the shoes • Seeking new manufacturer for heels • Shoe will be packaged at the existing packaging supplier • Distribution channel will be the same as current shoes
  • 8. Scope Statement • Market Analysis • Patent Plan • Budget Analysis • R&D Product Specification • Supplier Chain Plan
  • 9. Work Breakdown Structure Estro 1.0 Market Research Analysis 1.1 Competition Analysis 1.1.1.1 Niche Market Studies 1.1.1.2 Patent Plan 1.1.2 Budget Analysis 1.2 Preliminary Cost Benefit Analysis 1.2.1 Identify Profit Margin 1.2.1.1 Sales Projection 1.2.2 R&D Product Specification 1.3 Design Concepts 1.3.1 Supply Chain 1.4 Find Shoe & Heel manufacturer 1.4.1 Market Survey 1.1.1.3 Engineering of Heels Design 1.3.2 Shoes Design 1.3.3 Online market studies 1.1.1.4 Point of purchase studies 1.1.1.5 Patent Investigation 1.1.2.1 Identify Risk 1.2.1.2 Identify ROI 1.2.1.3 Identify R&D Cost 1.2.1.4 Identify Production Cost 1.2.1.5 Material Research 1.3.3.1 Material Research 1.3.2.1 Packaging 1.4.6 Quality Assurance 1.4.5 Shipping 1.4.7 Identify Hidden Cost 1.2.1.6 Material Sourcing: Heel 1.4.2 Material Sourcing: Upper 1.4.3 Material Sourcing: Sole 1.4.4 Prototype I 1.3.4 Prototype II 1.3.5 Prototype III 1.3.6 Finalize Material 1.3.7 Market Studies 1.1.1
  • 10. Success Criteria • Provide interchangeable shoe for women • Engineering and R&D design to fit per market demand • Using our established market to introduce the shoes
  • 11. Network Diagram 18 27 Market Studies 1.1.1 (10 days / 0 float) 18 27 1 4 Competition Analysis 1.1.1.1 (4 days / 5 float) 6 9 1 8 Niche Market Studies 1.1.1.2 (8 days / 1 float) 2 9 3 6 Patent Plan 1.1.2 (4 days / 33 float) 36 39 10 17 Market Survey 1.1.1.3 (8 days / 0 float) 10 17 1 9 Online market studies 1.1.1.4 (9 days / 0 float) 1 9 1 2 Point of purchase studies 1.1.1.5 (1 day / 7 float) 9 9 1 2 Patent Investigation 1.1.2.1 (2 days / 33 float) 34 35 40 40 Identify Profit Margin 1.2.1.1 (1 day / 0 float) 40 40 40 43 Design Concepts 1.3.1 (4 days / 0 float) 40 43 52 61 Engineering of Heels Design 1.3.2 (10 days / 0 float) 52 61 44 51 Shoes Design 1.3.3 (8 days / 0 float) 44 53 62 63 Material Research 1.3.2.1 (2 days / 0 float) 62 63 52 54 Material Research 1.3.3.1 (3 days / 9 float) 61 63 68 69 Finalize Material 1.3.7 (2 days / 0 float) 68 69 70 73 Prototype II 1.3.5 (4 days / 0 float) 70 73 74 81 Prototype III 1.3.6 (8 days / 0 float) 74 81 70 77 Find Shoe & Heel manufacturer 1.4.1 (8 days / 4 float) 74 81 87 90 Packaging 1.4.6 (4 days / 0 float) 87 90 82 86 Quality Assurance 1.4.5 (5 days / 0 float) 82 86 91 94 Shipping 1.4.7 (4 days / 0 float) 91 94 70 73 Material Sourcing: Heel 1.4.2 (4 days / 8 float) 78 8170 71 Material Sourcing: Upper 1.4.3 (2 days / 10 float) 80 81 70 71 Material Sourcing: Sole 1.4.4 (2 days / 10 float) 80 81 64 67 Prototype I 1.3.4 (4 days / 0 float) 64 67 28 31 Identify Risk 1.2.1.2 (4 days / 0 float) 28 31 28 28 Identify ROI 1.2.1.3 (1 day / 3 float) 31 31 28 29 Identify R&D Cost 1.2.1.4 (2 days / 2 float) 30 31 28 30 Identify Production Cost 1.2.1.5 (3 days / 1 float) 29 31 28 28 Identify Hidden Cost 1.2.1.6 (1 day / 3 float) 31 31 32 39 Preliminary Cost Benefit Analysis 1.2.1 (8 days / 0 float) 32 39 28 30 Sales Projection 1.2.2 (3 days / 9 float) 37 39
  • 18. Thank You Karen Brady Tsien White Samuel Sutanto

Editor's Notes

  1. Camileon Heels Day2Night Sheila’s Heels Ze-o-Ze
  2. Camileon Heels Day2Night Sheila’s Heels Ze-o-Ze
  3. Camileon Heels Day2Night Sheila’s Heels Ze-o-Ze
  4. Utilize current manufacturer for body and sole of the shoes Seeking new manufacturer for heels Shoe will be packaged at the existing packaging supplier Distribution channel will be the same as current shoes